Hoskote, Bangalore

Manufacturing capabilities

We select the process for the part geometry, load direction and agreed requirements.

01 / Wet layup

Apply resin to dry fibre.

The fibre is placed in a mould and cured. The layup is selected for the part.

02 / Resin infusion

Draw resin through dry fibre.

Vacuum moves resin through the fibre stack. Tooling and resin flow are reviewed before manufacture.

03 / Prepreg

Use fibre with controlled resin content.

Pre-impregnated fibre is laid up and cured to the specified material process.

Manufacturing evidence

Part evidence, not promises.

The evidence below is not available yet. Each slot is a placeholder, not a photograph of our workshop or a completed customer project.

PLACEHOLDER

Workshop photographs

Workshop photographs

To be confirmed. Verified company material will be added when available.

PLACEHOLDER

Finished parts

Finished parts

To be confirmed. Verified company material will be added when available.

PLACEHOLDER

Inspection examples

Inspection examples

To be confirmed. Verified company material will be added when available.

PLACEHOLDER

Customer-approved case studies

Customer-approved case studies

To be confirmed. Customer permission, project scope and verified results are required before publication.

Engineering experience

Drawing review.
Agreed checks.

One co-founder worked on the HAL Tejas programme at NAL. This experience informs our engineering approach. It does not imply programme ownership or company certification.

We review the drawing, agree acceptance checks and identify the documents included with delivery. Inspection methods and results are specific to the quoted part.

Request a quote ↗

Dissolvable-mandrel structures remain under internal development. They are not a production offering or flight-qualified structures.